Plans & Studies

Print
Press Enter to show all options, press Tab go to next option

For rate and fee studies, see Financial Information

Water

2015 Urban Water Management Plan, June 2016

Water Master Plan Update, March 2016

Appendices to Water Master Plan Update, March 2016

Tri-Valley Water Policy Roundtable: Potable Reuse Project

Tri-Valley Water Reliability Issues Survey, conducted November 2015

Possible Next Steps: Potable Reuse Feasibility Study and Public Education, February 2016

Long-Term Alternative Water Supply Study, Final Report, September 2015

Wastewater

Wastewater Treatment and Biosolids Facility Master Plan

Presentations to Board of Directors on draft report, March 21 and April 18, 2017

Sewer System Management Plan, September 2012

Odor Control Study, July 2009

Wastewater Collection System Master Plan Update 2005

Table of Contents
Executive Summary

Section 1 Introduction

Section 2 Land Use and Flows

Section 3 Modeling and Capacity Analysis

Section 4 Sewer Improvement Projects

Section 5 Capital Improvement Projects

Section 6 Other Recommendations

Appendices A and B

Appendix C

Appendix D

Appendix E

Appendix F

Appendix G

Appendix H

Appendix I

Appendix J

General Topics

DSRSD Strategic Plan for fiscal years ending 2018-2022, May 2017

Tri-Valley Utilities Coordination/Integration Study, Phase 1 Final Report, October 2013

Summary of Local Hazard Mitigation Plan, September 2009

 

 

 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer