Dublin Water & Wastewater
Water Fees for Dublin
DSRSD Water Capacity Charges
DSRSD provides potable and recycled water distribution services for Dublin. New connections represent an increase in demand for water distribution services. The DSRSD Code requires that this demand be assessed in the form of a capacity charge payable to DSRSD. Customers are purchasing capacity in the DSRSD water distribution system. Fees are based on meter size. Please note that accessory dwelling units (ADUs) do not require a separate fee unless an additional water meter is requested.
Meter Size | 5/8" Equivalence | Effective July 1, 2023 | Effective July 1, 2024 |
---|---|---|---|
5/8"
|
1.0
|
$15,511 | $15,670 |
3/4"
|
1.5
|
$23,267 |
$23,506 |
1"
|
2.5
|
$38,778 |
$39,176 |
1-1/2" (2" Omni C2 with 50 gpm restrictor)
|
5.0
|
$77,555 |
$78,350 |
1-1/2" (OMNI C2)
|
16.0
|
$248,176 |
$250,720 |
1-1/2" (OMNI T2)
|
16.0
|
$248,176 |
$250,720 |
2" (2" Omni C2 with 80 gpm restrictor)
|
8.0
|
$124,088 |
$125,360 |
2" (OMNI C2)
|
16.0
|
$248,176 |
$250,720 |
2" (OMNI T2)
|
20.0
|
$310,220 |
$313,400 |
Recycled water capacity charges are equivalent to potable water fees. DSRSD fees are revised annually on July 1 based on changes in the Engineering News-Record (ENR) Construction Cost Index and are subject to change at other times. For more information, please call (925) 875-2249.
Zone 7 Water Connection Fees
Alameda County Flood Control and Water Conservation District, Zone 7, provides potable water treatment services for Dublin. Zone 7 delivers treated potable water to DSRSD’s water distribution system for distribution to consumers. New connections represent an increase in demand for water treatment services. The Zone 7 Code requires that this demand be assessed in the form of a Zone 7 water connection fee. Water capacity reserve fees and Zone 7 Water connection fees shall be paid within 30 calendar days prior to installation of a new or larger water meter. Fees are based on meter size.
Meter Size | 5/8" Equivalence | Effective January 1, 2024 | |
---|---|---|---|
5/8'' |
1.0 |
$34,530 |
|
3/4'' |
1.5 |
$51,795 |
|
1"
|
2.5
|
$86,325
|
|
1-1/2" (2" Omni C2 with 50 gpm restrictor) | 5 | $172,650 |
|
1-1/2" (OMNI C2)
|
16.0
|
$552,480
|
|
1-1/2" (OMNI T2)
|
16.0
|
$552,480
|
|
2" (2" Omni C2 with 80 gpm restrictor) | 8 | $276,240 |
|
2" (OMNI C2)
|
16.0
|
$552,480
|
|
2" (OMNI T2)
|
20.0
|
$690,600
|
|
Meters 3" and up: Zone 7 determines fees using the fee factor for Maximum Rate for Continuous Operation. See https://www.zone7water.com/permits-fees
|
The above fees include connection fees, facility use fees, and administrative fees. Please note that Zone 7 fees are subject to change. For questions concerning Zone 7 fees, please call Steven Ellis at (925) 454-5037.
Wastewater Fees for Dublin
DSRSD provides wastewater collection and treatment services for Dublin. New connections represent an increase in demand for these services. Capacity charges are assessed to new customers before approval is granted for construction of new facilities or before allowing connection to the DSRSD wastewater collection system (sewer). Regional fees (for wastewater treatment) are based on the estimated volume and strength of wastewater discharge. Local fees (for wastewater collection) are based on the volume of wastewater discharge.
Capacity Charges (Local + Regional) per Residential Unit
Effective July 1, 2023 | Effective July 1, 2024 | |
---|---|---|
Single Family Homes, Townhouses |
$17,836
|
$17,965.67 |
Condominiums
|
$13,378
|
$13,475 |
Apartments
|
$11,772
|
$11,857 |
Accessory Dwelling Unit |
$11.41 per sq ft |
$11.49 per sq ft |
Capacity Charges for Nonresidential Uses
Effective July 1, 2023
|
Effective July 1, 2024 | |
---|---|---|
Regional
- Flow (unit=$/gpd)
|
$70.40
|
$71.17 |
- BOD1 (unit=$/lb/day)
|
$1,702.06
|
$1,720.78 |
- SS1 (unit=$/lb/day) |
$895.64
|
$905.49 |
Local | $12.21 gpd |
$12.34 gpd |
1Flow, BOD (Biochemical Oxygen Demand) and SS (Suspended Solids) are used to calculate fees for commercial and industrial customers. |
To get an estimate of the sewer capacity charges for your proposed enterprise, or if you have questions, please call (925) 875-2249.
DSRSD fees are revised annually on July 1 based on changes in the Engineering News Record (ENR) Construction Cost Index and are subject to change at other times.
Regional Wastewater Fee Installment Program
DSRSD is assisting the cities in its service area with their efforts to attract new restaurants, businesses, and affordable housing. Normally these new customers must pay a regional wastewater capacity reserve fee in advance. DSRSD offers an installment program that spreads payment of this fee over a period of up to 10 years.
To qualify for the program, you must be a new affordable residential, commercial, industrial, or institutional customer of DSRSD. Also, the regional portion of your wastewater capacity charges must be between $25,000 - $100,000.
Businesses that participate in the deferred payment program will be required to:
- Install an individual water meter on the portion of property that is covered under this program, so that interior water consumption may be measured.
- Provide a 20% down payment of the regional fee, pay an up-front administrative fee of $3,731, and pay 100% of the local fees.
- Agree to pay the remaining balance in equal monthly installments plus 5% per annum interest for a term not exceeding 10 years.
- Enter into a standard agreement with the District that will be recorded against the property record of the parcel where the business is to be located. The standard agreement must be signed by the fee title property owner.
For more information about this program, please call (925) 875-2249.