Standard Procedures, Specifications and Drawings

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Download ENTIRE Standard Procedures and Specs - not including Drawings (Updated September 2022)

Addenda List  (Updated September 2022)

Appendix A - Approved Materials List (Updated September 2022)

Appendix B - Standard Details (Updated August 2024)

Appendix C - SWRCB Separation

Appendix D - Disinfection Plan

Drawings (Download by Category)

General Details

Sewer Details

Water Details

Cathodic Protection Details (New as of September 2022)

Drawings (General, Water, Sewer to Download Individually)

G-1 Standard Trench Section for Water and Sewer Mains and Side Sewer Installations
G-2 Concrete Encasement Section
G-3 Close Crossing Detail
G-4 Marker Post (4” x 4”)
G-4A Roman Numeral Chart
G-5 Standard Trench Dam for Water and Sewer Mains and Side Sewer Installations
G-6 Clearance Requirements for Water Mains From Other Utilities and Structures
S-1 Peaking Factor Versus Average Daily Flow
S-2 Standard Manhole
S-4 Standard Shallow Manhole
S-5 Standard Manhole Frame and Cover
S-6 Miscellaneous Manhole Details
S-6A Manhole Pad Details
S-7 Manhole Frame and Cover Adjustment Details
S-8 Typical Side Sewer Installation
S-8A Typical Overflow Relief Valve Installation
S-9 Lateral Sewer Connection to Existing Sewer Main
S-10 Side Sewer Cleanout Riser for Commercial, Industrial and Multi-Family Complexes
S-11 Sampling Manhole
S-12 Grease and Sand Trap
S-12A Grease and Sand Trap for Trash Enclosure
S-13 Grease Interceptor 750-1500 Gallon Capacity
S-14 Grease Interceptor 2000-3000 Gallon Capacity
S-15 Sampling Box
S-16 Manhole: False Bottom 
W-1 Valve Box Installation
W-2 Concrete Thrust Blocks
W-3 Concrete Thrust Blocks for Vertical Bends
W-4 Valve Nut Extension
W-5 Backflow Prevention Method for Tanker Trucks and Portable Spray Rigs
W-6 Fire Hydrant Installation
W-7 1” Service Installation
W-8 1 ½” – 2” Service Installation
W-9 4” Blow-off Assembly at Dead End 6”, 8”, 10" and 12" mains
W-13 Gate Valve Installation 12” Gate Valve and Smaller
W-14 Butterfly Valve Installation 14” to 18” BFV
W-15 1” Air Release & Vacuum Relief Valve Installation 6”-10” Potable Water Mains
W-16 2” Air Release & Vacuum Relief Valve 12” Potable Water Main or Larger Installation
W-18 Temporary Sample Taps for New Construction
W-19 Meter Box Installations 5/8 Inch to 2 Inch
W-20 3” Meter Installation
W-20A 4-Inch Service w/2-Inch Meter Installation
W-21 Backflow Preventer Installation ¾” to 2”
W-22 2 ½” to 10” Reduced Pressure Backflow Prevention Device
W-23 Double Detector Check for 2"-10” Fire Lines Above Ground Installation
W-23A Double Detector Check for 2"-10” Fire Lines Above Ground Installation (Optional)
W-24A 1” Water Service with Two 5/8” Meter Manifold
W-24B 2” Water Service with Three 5/8” Meter Manifold
W-24C 2” Water Service with One ¾” Meter & One 1-1/2” Meter Manifold Installations
W-25 Fiberglass Enclosure for Backflow Preventer
W-26 Standard Sampling Station
W-27 Air Release & Vacuum Relief Valve Cover
W-28 Recycled Water Sign Post Detail
W-28A Standard Details for Placement of Recycled Water Irrigation Signs
W-28B Recycled Water Aluminum Sign Detail
W-29 Brass Address Tags for Manifolded Meters Sampling Station
W-30 Construction Jumper
W-31 ¾” to 3” PRV Installation For Recycled Water Irrigation System
W-32 Recycled Water Fire Hydrant Installation
W-33 Outdoor Plumbing Schematic (Single Family Residential Only)

 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer